Dublin Landings Drainage Works

Project Description

ClientBallymore Properties Ltd
Main Contractor: John Craddock Ltd
Installation MethodGuided Auger Boring

Brief Job Description

Installation of 96m of 225mm drainage pipe on North Wall Quay, Dublin.

The installation involved a 17m drive and connection to existing stone culvert, a 57m drive beside sensitive transmission gas AGI and pipework, and a 22m drive across North Wall Quay road directly into existing attenuation tank. The ground conditions were sand and gravel. The project was completed without any issues and ahead of schedule.